Weil-McLain -310 User Manual

Browse online or download User Manual for Water heaters & boilers Weil-McLain -310. Gas-fired water boilers – Series 3 QUICK-START - Weil

  • Download
  • Add to my manuals
  • Print
  • Page
    / 2
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
Part number C-1120 (0609)
Series 3
Gas-fired water boilers – Series 3
Featuring
Flexibility
Installation guide and material checklists
This guide must only be used by a qualied heating installer/service technician. Read all instructions, including the boiler manual
and all other information shipped with the boiler, before installing. Perform steps in the order given. Failure to comply could result
in severe personal injury, death or substantial property damage.
ITEMS
Boiler loop piping and components
NOTICE — The piping must be installed as primary/secondary, with
the boiler on its own loop as shown in the Ultra boiler manual and
in this guide. (This requirement is met when using optional Easy-up
Manifolds.) Use the pipe sizes listed below.
Pipe, valves and fittings:
(including flow/check
valve)
Ultra-80, 105
Ultra-155, 230
Ultra-299, 399
1” or larger
1¼” or larger
1½ or larger
Optional Ultra Easy-Up Manifolds (com-
plete, pre-assembled boiler loop piping;
circulator shipped loose with boiler) —
1¼” for Ultra-80/-105; 1½” for -155 to -399
Part numbers:
1¼” (383-500-649)
1½” (383-500-661)
System and zone piping
System circulator and zone circulators (or zone valves)
Pipe, valves and fittings for system and zone piping
Air separator and expansion tank
Fresh water make-up piping and components
DHW piping
DHW circulator
Pipe, valves and fittings (including flow/check valve)
Other piping
Gas piping, valves and fittings; ground-joint union and
manual shut-off valve for boiler gas connection; gas pres-
sure regulator, if required
¾” pipe and elbows for relief valve discharge piping
Condensate line
Pipe or tubing for condensate line — ½” PVC or CPVC pipe;
or 5/8” I.D. tubing
Condensate neutralizing kit when required
Weil-McLain part number 383-500-631
Condensate pump (required when condensate cannot
drain by gravity to an appropriate location)
Water treatment
Sentinel X100 inhibitor is shipped with each boiler and
must be applied as directed in the boiler manual.
Water treatment company must provide additional system
water treatment if required.
ITEMS
Electrical components
Wiring materials and fused shut-off switch
Zone valves and other system control devices, as
required
Carbon monoxide detector, when required
Antifreeze, when required
Use only antifreeze listed in Ultra boiler manual as suit-
able for use with Ultra Gas boilers (antifreeze is available
from Weil-McLain) — Ask your Weil-McLain distributor for
information or visit us online at www.weil-mclain.com to
review Ultra literature for recommendations.
Ventilation openings
Louvers for ventilation openings, when specified in boiler
manual
Propane applications
Ultra-80 can be ordered as propane or you can obtain
the Ultra-80 propane conversion kit.
For Ultra-80 at altitude up to 5,500 feet, use
W-M p/n 383-501-020.
All other Ultra boilers are shipped with items needed to
set up the boiler for propane, for altitude up to 5,500 feet.
High altitude propane, Ultra-80 only — For altitude
above 5,500 feet, all Ultra boilers require a high-altitude
propane conversion kit. The Ultra-80 must first be
equipped for propane (either purchased as Ultra-80LP or
converted to Ultra-80LP using the kit listed above).
Ultra-80LP 383-500-644
High altitude propane, Ultra-105–399 — For altitude
above 5,500 feet, all Ultra boilers (except Ultra-399)
require a high-altitude propane conversion kit. Obtain
the kit listed below:
Ultra-105 383-500-645
Ultra-155 383-500-646
Ultra-230 383-500-647
Ultra-299 383-500-648
Wall mounting option
Weil-McLain Ultra wall-mounting kit, p/n 389-900-180
Recommended equipment
Use a combustion analyzer to verify boiler operation,
following the instructions in the Ultra boiler manual.
U-tube manometer for checking gas line pressure
Volt-ohmmeter may be required for troubleshooting
Material checklist — piping and other items
QUICK-STARTQUICK-START
JOB NAME
Fold out the opposite page to see piping details.
88
44
55
66
22
Ultra model
Vent or air pipe size
• Allowable sizes of vent/air piping • Max. equivalent feet of each
• Number of elbows allowed at these lengths
(All applications include allowance for the termination.)
Sidewall
Direct Vent
with
Weil-McLain
Vent/air cap
Sidewall Direct Vent
with
Separate Pipes
— or —
Sidewall or Vertical
Direct Exhaust
Sidewall or Vertical
Direct Vent
3” PVC Concentric
(Use only PVC pipe DO
NOT use CPVC or ABS)
[Note 1]
Sidewall or Vertical
Direct Vent
4” PVC Concentric
(Use only PVC pipe DO
NOT use CPVC or ABS)
[Note 1]
Vertical
Direct Vent
with
Separate
Pipes
Length Ells Length Ells Length Ells Length Ells Length Ells
80 or
105
2” ** 100 (ab) 2 100 2 100 (ab) 1 NA 100 (a) 1
3” 100 2 100 2 100 1 NA 100 1
155 3” 100 2 100 2 100 1 NA 100 1
230
3” 30
(c) 2 30 (c) 2 30 (c) 1 30 (c) 1 30 (c) 1
4” 100 (d) 2 100 2 70 (d) 1 70 (d) 1 100 1
299 4” 100 2 100 2 70 (d) 1 100 1 100 1
399 4” 100 2 100 2 NA 100 1 100 1
Equivalent feet for elbows — deduct from maximum equivalent length of piping:
• 7 feet per for each 4-inch elbow & 2 or 3-inch 90° long-radius or 45° elbow
• 16 feet for each 2- or 3-inch short-radius elbow
a — Use 3"x2" reducer at boiler b — Use 3”x2” PVC reducers at termination
c — Use 4”x3” reducer at boiler d — Use 4"x3" PVC reducers at termination
Stainless (AL29-4C) vent pipe — install an adapter at the boiler for all applications. Also install an
adapter at the termination unless using separate-pipe termination.
** Ultra-80 and 105 boilers installed with 2-inch vent piping automatically derate due to the pres-
sure loss in the vent and air piping. The derate ranges up to 10% for the Ultra-80 at 100 feet or
15% for the Ultra-105 at 100 feet.
Note 1: IPEX 3” and 4” PVC concentric vent kits can be used with standard PVC pipe, fittings and
cement (ANSI/ASTM D1785) except where ULC S636 compliance is required. For ULC S636 compli-
ance, all pipe, fittings and cement must be IPEX System 636. When using IPEX kits, use only IPEX
product code 196006 for 3” venting or IPEX product code 196021 for 4” venting.
Contact Weil-McLain for ordering information and availability of Weil-McLain venting kits.
Items Material
Standards for installations in:
United States Canada
PLASTIC piping materials (vent or air piping)
Pipe
&
Fittings
PVC schedule 40
ANSI/ASTM
D1785
Plastic vent pipe
must be certied
to ULC S636 when
required. (Note 2)
Air pipe can be
any of those
listed at left if
acceptable for
local codes.
PVC-DWV (Note 1) D2665
CPVC sch 40
(Note 1) F441
ABS-DWV sch 40
(Note 1) D2661
Cement
PVC D2564
CPVC
(Note 1) F493
ABS
(Note 1) D2235
Primer PVC, CPVC or ABS F656
AL29-4C piping materials
Vent
pipe
Heat Fab, Inc. Saf-T-Vent
®
Z-Flex, Inc. Z-Vent II
Simpson Dura-Vent FasNSeal
Certied for Category IV and
direct vent appliance venting
Note 1: DO NOT use DWV, CPVC or ABS when using concentric vent ter-
mination. Use ONLY PVC schedule 40.
Note 2: IPEX PVC concentric terminations utilize PVC pipe/ttings certied
to ULC S636. Where ULC S636 compliance is required, use only IPEX
System 636 pipe, ttings and cement.
AL29-4C vent piping — Install a PVC-to-stainless adapter supplied
by the vent pipe manufacturer at the boiler vent connection and
at the termination (when using Weil-McLain plate or concentric
PVC termination). DO NOT mix piping from dierent vent pipe
manufacturers unless using adapters specically designed for the
purpose by the manufacturer.
Plastic piping — Do not attempt to connect dierent types of
plastic piping together.
DO NOT use cellular core pipe.
All vent and air pipes require a bird screen at each termination
where specied in the manual or vent supplement.
Material checklist — vent and air piping
NOTE: Also obtain all required ashings, boots, thimbles, re stops or
other items required for wall, ceiling and roof penetrations.
QUICK-STARTQUICK-START
Pipe and fittings — PLASTIC
Material —
PVC
CPVC ABS
Size —
2
3 4
ITEM QTY
Straight pipe
feet
Elbows, 90-degree (include termination elbows if required)
Couplings (include termination if vertical separate pipes)
Return bend, 180-degree
(vertical separate-pipe termination)
1
Reducers: 3"x2"
4"x3"
Pipe and fittings — AL29-4C Stainless
Product —
Saf-T-Vent
®
Z-Vent II
FasNSeal™
Size —
2
3 4
ITEM QTY
Straight pipe
feet
Adjustable lengths
Elbows, 90-degree
Termination elbows (with integral screen), when req’d
Elbows, 45-degree
Adapter at boiler (to t diameter of boiler connection)
Adapter at termination, if required
Items required
(DV=Direct Vent; DE=Direct Exhaust)
W-M P/N QTY
Sidewall with Weil-McLain Plate
W-M sidewall term. kit 3"
4"
383-500-397
383-500-398
1
Included
with boiler
Includes W-M sidewall vent/air termination cap and
inside/ outside cover plates and mounting hardware;
openings are sized for PVC pipe.
3" cap is shipped with Ultra-80–155.
4” cap is shipped with Ultra-230–399.
Sidewall DV with separate pipes or DE (elbow)
Inside and outside cover plates and mounting
hardware supplied with boiler can be used at wall
penetrations if size is the same as the pipe used. (Cut
plates to size for direct exhaust applications.)
Bird screens 3"
(For 2” pipe, trim 3” bird screen to size) 4"
383-500-105
383-500-110
1 DE
2 DV
Vertical DV with separate pipes or DE (coupling)
Bird screens 3”
(For 2” pipe, trim 3” bird screen to size) 4”
383-500-105
383-500-110
1 DE
2 DV
Coupling (1) Add to the table at right
180- degree return bend (1) (DV only) Add to the table at right
3" or 4” PVC concentric termination, sidewall or vertical
Standard C. T. kit, 3"
S636 compliant C. T. kit, 3”
S636 compliant C. T. kit, 4”
383-500-350
Consult factory
Consult factory
1
Reducers: 3”x2”
4”x3”
Add to the table at right
Fold out the opposite page to see venting details.
33
C-1120 (0910)
Page view 0
1 2

Summary of Contents

Page 1 - QUICK-STARTQUICK-START

Part number C-1120 (0609)Series 3Gas-fired water boilers – Series 3FeaturingFlexibilityInstallation guide and material checklists This guide must only

Page 2

BEFORE INSTALLING . . .Make sure there is enough clearance for the boiler and all •water, gas and air piping. Verify vent/air termination can be loca

Comments to this Manuals

No comments